County Road Administration Board
  • Home
  • Administration
    • About CRAB
    • Accountability
      • Laws and Rules
    • Standards of Good Practice
    • Compliance
    • Reports
      • Annual Report
      • CFGS Report
      • MMS Report
  • Funding
    • Grant Programs
    • Motor Vehicle Fuel Tax
    • Property Tax
  • Engineering
    • Administration
      • Professional Development
      • Organizational
      • Personnel
    • Compliance
      • Training and Guidance
      • Policies
      • Technical
    • Operations
      • Construction
      • Preservation
      • Maintenance
  • Technology
    • Design Systems
    • Mobility Software
    • Training
      • Design Systems Training
      • Mobility Training
    • CRAB FTP Site
  • Counties
    • County Profiles (MRSC)
    • County Contacts
    • County Data Tables
    • County Job Links
  • Library
  • Contact
Search CRAB Web

Project Links

  • Grant Program Projects
  • Active Projects
  • RAP Current Project Funding
  • Project Lapsing Status
  • Completed 2000 - 2009
  • Completed Pre - 2000
  • Featured Projects
  • RATA Fund Expenditures

Related Links

  • Grant Programs
  • Construction
  • Preservation

Related Links

  • Grants Home
  • Projects
  • RAP Forms
  • RAP FAQ's
  • RAP Regions
  • Due Dates Calendar

 

 

Access Washington

 

Featured Project


SKAGIT COUNTY - PIONEER HWY AND EAST HICKOX ROADROAD

Project Summary
Project Images

Project Number: CAPP
From Milepost: 0 To Milepost:0
RATA/CAPP funds: $ 465,072
Design Software: Eagle Point
Completed: 2006

Skagit County used their CAPA funds to address serious pavement problems on Pioneer Highway and East Hickox Road in 2006. Pioneer Highway is the second highest volume roadway under Skagit County jurisdiction. This roadway is a vital link between Skagit County and Snohomish County carrying approximately 10,000 vehicles a day.

East Hickox Road provides acess to a major quarry within Skagit County with truck percentages nearing 20 percent of the traffic on the roadway. The roadway was showing severe distress in the west bound lanes as the trucks left loaded. Along with the heavy truck traffic this road also connects with numerous local access roads and neighborhoods.

Click on project thumbnails to display larger images.

road project image road project image




CRAB point of contact for both RAP and CAPP programs is Randy Hart P.E., Grant Programs Manager, 360.753.5989


© Copyright 2009 County Road Administration Board - HomeSearchPrivacyAboutContactFeedback